A growing family in Northeast Olympia needed more room on the property they already call home. The answer was a detached, 400-square-foot accessory dwelling unit with one bedroom, one bathroom, a full kitchen and its own laundry.
We handled the ADU as a full design-build project, from the first drawings and permits through excavation, foundation, utilities and finish work. Construction took about 12 weeks.
Project snapshot
- Location: Northeast Olympia, Thurston County
- Size: 400 sq ft, 1 bed / 1 bath
- Timeline: about 12 weeks of construction
- Total investment: about $300K, including design, permitting and construction
Work completed
- Design, drafting, engineering and permitting
- Excavation and a stemwall foundation
- Septic, water and electrical connections
- Framing and trusses, roof, siding, windows and doors
- Insulation to Washington energy code
- Ductless mini-split heat pump
- A full kitchen and a full bathroom
Standout features and materials
- Kitchen: Bellmont Colony cabinets, MSI Bayshore Sand quartz countertops and a glossy bone 4×16 subway tile backsplash
- Bathroom: yellow and white hexagon porcelain floor tile, beadboard wainscoting and an “Out to Sea” blue upper wall
- Throughout: LVP flooring, a built-in closet system and a stacked washer/dryer