400sf Thurston County ADU

Thomas project: side exterior

A growing family in Northeast Olympia needed more room on the property they already call home. The answer was a detached, 400-square-foot accessory dwelling unit with one bedroom, one bathroom, a full kitchen and its own laundry.

We handled the ADU as a full design-build project, from the first drawings and permits through excavation, foundation, utilities and finish work. Construction took about 12 weeks.

Project snapshot

  • Location: Northeast Olympia, Thurston County
  • Size: 400 sq ft, 1 bed / 1 bath
  • Timeline: about 12 weeks of construction
  • Total investment: about $300K, including design, permitting and construction

Work completed

  • Design, drafting, engineering and permitting
  • Excavation and a stemwall foundation
  • Septic, water and electrical connections
  • Framing and trusses, roof, siding, windows and doors
  • Insulation to Washington energy code
  • Ductless mini-split heat pump
  • A full kitchen and a full bathroom

Standout features and materials

  • Kitchen: Bellmont Colony cabinets, MSI Bayshore Sand quartz countertops and a glossy bone 4×16 subway tile backsplash
  • Bathroom: yellow and white hexagon porcelain floor tile, beadboard wainscoting and an “Out to Sea” blue upper wall
  • Throughout: LVP flooring, a built-in closet system and a stacked washer/dryer